The last two weeks have been very busy at our household. The house addition is coming along nicely and should be close to finished when the baby comes. The roof is completed. This last week they put up all the drywall, enclosed all of it, started siding and broke through our house into the kitchen. We really like what they have done. We are in the process of picking out the fixtures, trims, lighting, flooring, etc. It is very hard. Enjoy the pictures.


This is where they broke through into our kitchen. Where the stove is now is where we cut off a couple feet of the counter. If you walk through this walkway into the addition that first room is the new dining room.

In the dining room you will either be able to go left into Emma's room or right into our master bedroom.

This will be our bedroom. The window on the back wall there is a picture window. There are two windows on the right looking out towards the backyard. They are long windows. There is drywall leaned up against that wall so it blocks seeing them.

This is our walk in closet.

This will be the bathroom. Shower to the left and double sink vanity.

Toilet will go below that window. Linen closet will go in that area to the left. This is still part of the bathroom.

This is Emma's bedroom and she has a walk in closet to the left. I couldn't get into this room with the stand up furnace in the doorway.

And this is walking back from the bedrooms through the dining room into the kitchen.

And a worn out little boy who was unable to take a nap because the electricians were installing extra outlets and new electronic smoke detectors upstairs. This is the first time he has ever fallen asleep outside of his bed or car seat.